Construction

1. Preparation of the Foundation.

As a constructive solution to the Foundation for the construction of our objects, we choose helical piles with a monolithic grillage, without penetration into the ground. Screw piles allow to completely abandon the excavation works, twisted by hand, there is the possibility of dismantling and reuse when needed.

2. Assembly and installation of the frame.

All-season material at -30°C does not require shrinkage of the Foundation. The construction of the frame is carried out in a short time with 100% factory-assembled frame elements. When installing the frame does not use a special technique.

3. Construction of internal engineering communications.

Engineering networks are laid indoors and in the walls.

4. Thermal insulation of walls, installation of windscreens and waterproofing.

Nonflammable basaltic mineral wool insulation or lightweight concrete is placed inside the walls. Placed in the walls of lightweight concrete or basalt insulation. Installed waterproofing on the walls outside. Vapor barrier inside the building and removed the "cold bridges".

5. Paneling, installation of Windows and doors.

The covering of external and internal walls is usually made from sheets of drywall, but can be applied cement-bonded particleboards (cbpb) and is oriented particle Board (OSB).

6. The exterior finish.

External finish: painting walls, plaster, painting, trim siding, brick, faux stone, wooden block-house.

7. Interior decoration of the room.

For interior decoration of the house include the installation of internal plumbing, electrical wiring, grouting, painting, pasting, and other fine finishing.

8. The final stage — installation of elements of a Museum or attraction for Your facility.

As a rule, the fastening of the furniture to the ceiling or the Assembly and fastening of other objects, which is in strict accordance with the developed design documentation, as compliance with all Rehlementov ensures complete safety for all visitors to the art object.