Upside down house


Stavropol 2017

the slope of 10/7°

63 m2

This is a record project, which was implemented in 1.5 month from the moment of the construction of the frame to the first visitor. The work was carried out during strong winds, rain and snow in three shifts. At the same time on the court was up to 17 builders. The Grand opening took place on 4 January 2017.